The editing has now been completed to a standard which I am happy with. I have shown my peers and teachers the video, both have given me positive feedback and also have given me ideas to include to enhance the video. I have taken these ideas on board and have added them where I can to the production.

I've found the editing to be the most enjoyable part out of producing the video, I like having the footage readily avaliable and being able to cut it to sounds or in this case, to be able to cut the footage to the beat of the music.

However I did encounter some problems along the way, media files were sometimes offline, requiring me to re-connect them to enable playback. Another problem I encountered was when I tried removing clips that I had placed in the timeline, it shifted all of the clips after the selected to the left, making almost every clip out of beat. However this was easily fixed when I was taught how to lock certain tracks and to cut out clips without affecting the others surrounding it.

Wednesday, 23 March 2011

Filming Stage 2

Now that I have footage imported and edited to the song, I can now plan to film the 2nd stage of my music video. This section of filming will take place in the school Drama Hall. I have spoken to the head of drama at our school and have been given the go ahead, giving me 3 hours tomorrow in the location to film. This time limit is ideal as I am going to use the first hour to set up equipment and the other two to film. An update will follow in due course, notifying how the filming has gone.

24/03/11 UPDATE : I have just got back from filming the 2nd stage of my production and I have to say that it was stressful. It wasnt so much the filming that was the problem, it was the planning and moving the equipment from place to place. However the first hour gave me more than enough time to eventually set everything so that I could commence filming. I'l update the post as soon as the footage has been imported into Final Cut Express. Please find below images of the 'set up' that I used in the Drama Hall.

27/03/11 UPDATE : The footage obtained has now been successfuly imported into Final Cut Express. Now the editing process has begun, The next post will be once editing has been completed.






Tuesday, 15 March 2011

Commence Filming

Tonight I am going to begin my first batch of filming. This is going to include shots of the roads at night, giving me footage to begin work on. An update will follow in this post once I have uploaded and imported the footage into final cut express.

14/03/11 UPDATE : Last night was a success, I have now imported the footage into Final Cut and have now begun editing. If required to do so, I may go out on another road trip to gain some more footage however I feel that it would be unnecessary. Next on the list is to film in the Drama Hall. I shall update the post once I have filmed and have uploaded the footage into Final Cut.

15/03/11 UPDATE : The footage that I filmed has now been successfully imported into Final Cut Express. This now means that the editing stage is commencing and also the second stage of filming is also getting nearer to beginning.

Thursday, 10 March 2011

Casting Problems

I have recently been talking to Inferno and they have decided not to take part in the music video because of upcoming exams and the time it will take to film may interrupt their revision schedules. Although this is not practical for myself, I can understand their reasons to why they are unable to appear in the video.

So because of this change, I had to rethink and now have created a back up plan. This plan consists of the video being shot in two locations. The first location will stay as the drama hall, featuring one character with various glowing items e.g glow sticks, face paints etc. The second location that I have chosen is filming driving down the road at night, watching how the night has an orange coloured 'glow' to it.

Having two locations will break up the music video, giving me more to work with thus making for a better music video.

Wednesday, 2 March 2011

Task Checklist

Below is the checklist that I have been following, it will be updated when the next task(s) are completed.

Wednesday, 9 February 2011

Stage Layout

Now that both Ancillary tasks have been completed, I have designed a stage layout which can be seen below, the layout is giving myself and others a rough idea on how I plan to use the space avaliable.



- The green space surrounding the dancers is indicating the area which they will be using for their routine.

- The 'UV' cell is indicating where the light source will be placed and the direction in which the light is travelling.

Tuesday, 8 February 2011

Casting

Now that I have found a suitable location to film, next on my list of things to do is to work out who is going to star in the music video. Because of the nature of the song and also the video being more performance based, I have sourced a dance group in school called 'Inferno'.

Inferno are a dance group consisting of 7 girls. In 2009 they were victorious in a local talent competition known as 'The K Factor', the K Factor showcases talented students, all of which attend Kettering Buccleuch Academy.